WATER PROOFING SERVICE

NEW OR OLD BATHROOM/BALCONY WATERPROOFING

Chemical Method It mainly depends upon the procedure and specification given by client / architects. In general it is a two component polymer modified cementitious coating. It is…

Written Warranty
Certified Materials
24-Hr Response
Trained Crew
NEW OR OLD BATHROOM/BALCONY WATERPROOFING in Visakhapatnam

About This Service

Chemical Method

It mainly depends upon the procedure and specification given by client / architects. In general it is a two component polymer modified cementitious coating. It is an ideal waterproof coating which forms elastomeric membrane capable of excellent adhesion, breathability and flexible – non toxic. The two components are mix thoroughly to form a paste and is applied on the wet surface with a brush two coats are recommended. After the second coat is applied a protective tacky coating or plaster has to be done in C:M (1:4), the average thickness of our treatment will be 25mm to 40mm as required

Brickbat Coba Method

The new Bathrooms/Toilets/Flower Beds/Kitchen Moris etc. are treated with Surface Method which starts directly over the RCC slab. The internal wall shall be plastered leveling a space of about 600 mm (2 feet) from floor level (or as per your specification). Before the commencement of our work all chiseling/cutting in the floor and wall shall be done by the plumber. We shall then put a layer of waterproof plaster of about ¾” in which stone aggregate of 15mm to 20mm nominal size will be embedded/fixed by hand at random (the treatment shall then be cured for atleast 24 hours). We shall now again provide a layer of waterproof plaster of about ½” above the stone aggregate. The treatment shall be carried on the side of sunken slab and side walls upto 600mm above floor level. The thickness of the treatment on the walls will be about ¾” (the treatment shall then be cured for atleast 24 hours). Now, the plumber shall finish all his plumbing work i.e. laying and fixing of pipes, nahani traps, pans, etc. without any further breaking or disturbing our treatment. After plumbing work, we shall fill in the depression (sunken) portion with our brick-bat coba method (brick-bat fixed in the cement mortar upto required level. (The treatment shall then be cured for atleast 24 hours). We shall now provide waterproof plaster of about ½” above the brick-bat layer, which shall be finished rough suitable to receive tiles to be laid by the owners.

NOTE: The rates are quoted separately for Marble/Granite work, filling of sunken part and plaster work. No deduction in the floor and wall area for pans and other fittings and fixture are made in the measurement.

JASH INFRA (Waterproofing) Warranty

All work completed by Jash Infra carries a warranty of 10 years. Your Jash Infra (Waterproofing Works) signed contract is your actual Warranty Certificate.

Jash Infra warrants all materials and workmanship only pursuant to the job description details on your written contract, provided the home owner / society / builder / client has made full and final payment.

WARRANTY PERIOD : 1 / 3 / 5 / 7 / 10 YEARS (As applicable)

Key Benefits

End-to-End Execution

Single point of contact for design, procurement, labour and quality — no coordination hassle for you.

Budget-Transparent Billing

Detailed line-item quotation upfront. Any variation is discussed and approved by you before proceeding.

Certified Materials Only

All materials sourced from authorised dealers — branded tiles, plumbing fittings, electrical components.

Milestone-Based Schedule

Work broken into clear milestones with dates. You review and approve each phase before we move ahead.

Daily Progress Updates

WhatsApp photo updates daily — so you're never in the dark about your project's progress.

Post-Completion Support

Any snag list items are resolved within 7 days of handover at no additional cost.

Our 6-Step Process

Every project follows this proven process — no shortcuts, no guesswork.

01
Free Site Inspection

Our specialist visits your site, photographs the affected areas and identifies root causes of the problem.

02
Assessment Report

A written report with photographs, recommended treatment plan and a transparent, itemised cost estimate.

03
Surface Preparation

Cleaning, crack filling, chipping and priming the substrate to ensure maximum adhesion and longevity.

04
Treatment Application

Premium-grade materials applied in the correct sequence and thickness per manufacturer specifications.

05
Quality Inspection

Water ponding test, thickness checks and visual inspection conducted before handing over the site.

06
Warranty & Handover

Written warranty certificate issued. Periodic free follow-up inspections during the warranty period.

Materials & Brands We Use

We source directly from authorised distributors — no substitutes, no compromises.

DF
Dr. FixitIndia's #1 construction chemical brand
FK
FosrocInternational specialty chemicals
SK
SikaSwiss precision, global standards
AP
Asian PaintsPremium interior & exterior paints

Areas We Serve

Our teams operate across North Andhra Pradesh. Same-day inspection available in Visakhapatnam city.

Visakhapatnam Vizianagaram Bheemunipatnam Anakapalli Narsipatnam Kakinada

Frequently Asked Questions

A single-room renovation takes 5–10 days; a full apartment renovation takes 4–8 weeks depending on scope and finishing.

Yes, we work room-by-room with temporary partitions and cleanup between stages to minimise disruption to daily life.

Yes. We provide 2D layout plans and material samples for your approval before any work begins.

Changes are noted, costed and agreed in writing before execution — transparent variation orders, no surprise bills.
12+Years Active
2000+Projects Done
15 YrMax Warranty
100%Satisfaction

Get a Free Quote

For NEW OR OLD BATHROOM/BALCONY WATERPROOFING in Visakhapatnam

Our Guarantee
  • Free site inspection
  • Written cost estimate
  • Certified brand materials
  • Trained professional crew
  • Written warranty certificate
  • Post-job support included
Call WhatsApp Enquiry