Step-1: Breaking of Loose / Whole Old Plaster (as required) Step-2: Making of New Plaster (2 coats) with Waterproofing Compound
Crystalline and polymer-based systems penetrate the substrate to block water at the molecular level.
Prevents rebar corrosion and concrete degradation — extending the life of your building by decades.
Reflective heat-resistant coatings reduce roof surface temperature by up to 15°C in summer.
Anti-microbial additives in our coatings prevent fungal growth, eliminating musty odours.
Injection and crystalline methods treat bathrooms without tile removal — minimal disruption.
Certain systems from Dr. Fixit and Fosroc carry manufacturer warranties of up to 15 years.
Every project follows this proven process — no shortcuts, no guesswork.
Our specialist visits your site, photographs the affected areas and identifies root causes of the problem.
A written report with photographs, recommended treatment plan and a transparent, itemised cost estimate.
Cleaning, crack filling, chipping and priming the substrate to ensure maximum adhesion and longevity.
Premium-grade materials applied in the correct sequence and thickness per manufacturer specifications.
Water ponding test, thickness checks and visual inspection conducted before handing over the site.
Written warranty certificate issued. Periodic free follow-up inspections during the warranty period.
We source directly from authorised distributors — no substitutes, no compromises.
Our teams operate across North Andhra Pradesh. Same-day inspection available in Visakhapatnam city.